It does have a delay. I think mine is about 5 minutes. I can't seem to get the time stamp to sink up either. I'm off by an hour. I monitor two units with the app. It's pretty basic but I just want ...
It does have a delay. I think mine is about 5 minutes. I can't seem to get the time stamp to sink up either. I'm off by an hour. I monitor two units with the app. It's pretty basic but I just want ...
When you get battery low enough to trip 04 it will go to bypass. When solar charges it up to 05 it will switch back to battery.
You will need a split phase inverter for 240v because the phases from two different inverters won't stay in phase. I would look at one of the hybrid packages and ask tech support to make sure it wi...
parameter 1 should be SBU parameter 6 should be OSO This is how i set mine up most of the time. Yous have to adjust P04 and P05 for the voltage you want the system to go to utility on and back t...